Apps | Mobile | Alerts
 

Work crews clearing land for bridge work

Reported by: Mel Carlock
Set Text Size SmallSet Text Size MediumSet Text Size LargeSet Text Size X-Large
Share
Updated: 2/21 11:22 am
TUPELO, Miss. (WTVA) --  Work crews have begun the process of clearing the land for the contruction of a bridge on the northern loop project in Tupelo.

Workers are removing trees and hauling away dirt from the worksite on Barnes Crossing Road just east of the Natchez Trace Parkway.

Construction of the bridge is one of the last phases of opening the roadway.

Major Thoroughface Committee members say it will take nearly 18 months to complete the bridge over the NTP.

During construction, the speed limit on the Parkway has been reduced to 40 miles per hour from the NTP headquarters to Highway 78.

Walking trails through the area are also closed until the work is completed.

A bridge to connect the Coley Road Extension with the new roadway must also be built, but no starting date has been announced for that part of the project.
Share
Inergize Digital This site is hosted and managed by Inergize Digital.
Mobile advertising for this site is available on Local Ad Buy.

Copyright © 2009–2013 WTVA Inc. | Terms Of Use | Privacy | EEO Report | FCC 398 | FCC Public Inspection File